Destination — Africa

Shipping from China to Morocco — 29–64 days sea freight, duty and customs

Tanger Med is the gateway for Morocco and it is a strong one: 10 of 61 sailings in October 2026 were direct at 29–43 days, with Shekou reaching it in 29. Casablanca has a much deeper schedule of 116 sailings but is relay-only at 38–81 days. Duty and the 20% VAT were not substantiated from the Moroccan customs administration, so they are confirmed per shipment.

29–64 days sea freight from China to Morocco. What Morocco requires on arrival: who may import, what duty and tax apply, and which certification and product rules must be in place.

What does Morocco require before the cargo can be imported?

Morocco is served from China by ocean, air and express, and the arrival-side requirements below are the part that most often changes a landed cost or holds a shipment at the port. Each position is the one we publish for this market and is confirmed per shipment against the actual commodity code and destination city.

What duty, tax and levies apply on arrival?

Duty and taxThe Moroccan duty position has not been substantiated from a primary source here: the customs administration pages did not render the tariff from this environment. The applicable duty is confirmed per shipment rather than generalised. Source: Not substantiated · retrieved 2026-09-19
Import taxMoroccan VAT is charged on the customs value plus duty. The rate has not been substantiated from a primary source here, so it is confirmed per shipment. Source: Not substantiated · retrieved 2026-09-19

Who is allowed to import into this market?

Importer of recordA Moroccan importer of record is required, and declarations run through the Moroccan customs system (BADR). The registration route is confirmed per shipment. Source: Not substantiated · retrieved 2026-09-19

What certification or product rules must be in place before shipping?

Pre-shipment certificationSONCAP for Nigeria and PVoC for Kenya and Tanzania must be arranged before loading
Certification and product rulesRegulated categories carry their own approvals, and IMANOR is the usual standards body for consumer and regulated goods. Which approvals apply to a given shipment is confirmed per shipment. Source: Not substantiated · retrieved 2026-09-19

How long does the freight take from China?

Published carrier or forwarder ranges for this lane. Where no figure could be substantiated the row says so rather than offering an estimate.

ModeTypical transitWhat it covers
Ocean freight — Tanger Med29–64 daysPort to port, measured across 61 published sailings in October 2026. 10 were direct at 29–43 days: Shekou 29–38, Ningbo 34–41, Shanghai 38–43. Source: ONE (Ocean Network Express) public point-to-point schedule API · retrieved 2026-09-19
Ocean freight — Casablanca38–81 daysPort to port, measured across 116 published sailings in October 2026. No direct sailing was published, but the schedule is the deepest measured in this batch. Source: ONE (Ocean Network Express) public point-to-point schedule API · retrieved 2026-09-19
Air freightConfirmed per shipmentNo authoritative airport-to-airport figure for this lane has been substantiated yet. Source: Not substantiated · retrieved 2026-09-19
Express courierConfirmed per shipmentThe courier networks do not publish a China-to-Morocco door-to-door day count we can cite. Source: Not substantiated · retrieved 2026-09-19

Which gateway does cargo arrive through for Morocco?

The port, airport or inland terminal this destination's cargo arrives through.

Gateway portsDurban, Cape Town, Mombasa, Lagos (Apapa and Tin Can), Tema, Port Louis
Gateway airportsJNB, NBO, LOS, CPT
Destination portsTanger Med is the primary gateway and Casablanca the secondary one. Tanger Med takes direct calls from China in 29–43 days, which makes it one of the faster Mediterranean gateways measured on this site.

How do you turn this into a landed cost?

Duty is assessed per commodity code, so the positions above tell you what to prepare rather than what you will pay. Screen the official duty range for the HS chapter your product falls in with the HS chapter duty lookup, then put the rate for your actual code through the landed cost calculator to see duty, import tax and levies on the CIF value. Sailing schedules, loading ports and the stage-by-stage breakdown for this lane are confirmed per shipment and come back with your quotation.

Positions reviewed 2026-09-19 by Helen Peng. Duty, importer-of-record and certification answers are confirmed per shipment: a change of commodity code, origin documentation or destination city can change the position.

Where is the rest of this lane documented?

This page covers arrival requirements only. Sailing schedules, loading ports and the stage-by-stage breakdown are confirmed per shipment and come back with your quotation, so they are not restated here.

Where are the photographs of this destination?

We have not yet photographed this lane's destination operations. Rather than borrow a stock or generated picture, the slots below are left empty and labelled. They are filled only with our own photographs from this lane.

Photo to be addedArrival and handling of our cargo in MoroccoOur own photograph from this lane, once recorded
Photo to be addedFinal delivery in MoroccoOur own photograph from this lane, once recorded

Need the duty confirmed for your product?

Send the commodity, its material, its use and the destination city, and we will confirm the position.

Start your enquiry
WhatsApp us