What does this cover?
Project cargo requires technical review of lifting, securing, route, permits and staged delivery planning.
Project cargo is quoted per shipment rather than per container, because the price depends on dimensions, weight, lifting points, permits and whether the route takes the load. Where the pieces fit standard equipment the sea transit is 25–35 days door to door to the Gulf and the Americas; where they do not, the plan is built around the cargo.
Large, heavy, irregular or phased project shipments.
Project cargo requires technical review of lifting, securing, route, permits and staged delivery planning.
A 117-tonne steel consignment moved from a Changzhou factory to Tashkent as five coordinated truckloads, including China steel export licensing, CMR paperwork and border handling.
Read case →Case studyA Saudi building-materials importer moved a mixed steel consignment from Tianjin to Jeddah, loaded with a yard loader and reinforced on all sides because the items were long, heavy and could not be compressed.
Read case →GuideFour structural tensions explain almost every problem buyers hit when importing from China — and each one comes with something you can check before you commit, whoever you end up shipping with.
Read guide →GuideWhat actually moves a freight rate, where each transport mode stops being the right choice, what a shipment really costs, and how exceptions are prevented — with the public source behind each answer.